Boot Up: Have a seat at a table with your partner, see list on screen.
Programming:
Apps:
IM: What are some challenges that you have run into so far?
Power Down: Make sure all materials are put away, be sure to carefully put all parts back into your kit organized, and then stack them on the cart.
Programming:
- STARR Reminders: Collaboration, Positive Attitude, Cooperation, Teamwork
- Should be wrapping up construction of Phase 1 today.
- Try to use controller/brain link procedure, Mr. H will demonstrate
- Get Phase 1 construction/control checked today, Wednesday.
- Demo on installing/removing vehicle battery.
- Begin Phase 2 AFTER PHASE 1 IS CHECKED.
- Remember Wednesday is half-day, lunch choice? Advisory at the end of day on Wednesday procedures.
Apps:
- Controller need charging?
- Finish Construction of Phase 1 of First Project.
- Sync controller/brain, practice controlling vehicle.
- Have Phase 1 construction checked by Mr. H
- Proceed to Phase 2.
IM: What are some challenges that you have run into so far?
Power Down: Make sure all materials are put away, be sure to carefully put all parts back into your kit organized, and then stack them on the cart.
Happy National Banana Bread Day, Curling is Cool Day, & Play Tennis Day!